TBF is a professional custom commercial truck body parts supplier and vehicle body fittings manufacturer.

TBF  >  AI - Page Sitemap  >  latest roll up door parts trailer factory for Trialer
latest roll up door parts trailer factory for Trialer

Latest roll up door parts trailer factory for Trialer

Specifications:
Advanced trailer rolling door equipment double rolling door
Part no.:
104000-3
Matetial:
ALU
Weight:
8kg/M2
Pcs / Carton:
1 sets
Carton Size:
W OF DOOR(MM)*W150MM*H150MM
MOQ:
1 sets
Payment Item:
T/T, west union, PAYPAL, alipay
Delivery Date:
10-25 days
Port Of Loading:
Shanghai
Surface Treatment:
Oxidation (color customizable Need moq)
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product Information of latest roll up door parts trailer factory for Trialer

Product Feature


◆ Suitable height of door: 0.3M-3M.
◆ Suitable width of door: 0.3M-3M.
◆ Working environment temperature: -20℃---+50℃.
◆ Handle type: Unfold Install OR concealed installation.
◆ Material technology: Extrusion.
◆ Slider design process: Double layer waterproof design/snap type.
◆ Curtain piece design process: You can choose any of the five ways to open it.
◆ Connection plate design process: Fasten with a bolt OR rivet.
latest roll up door parts trailer factory for Trialer-1
Product Display


latest roll up door parts trailer factory for Trialer-2
latest roll up door parts trailer factory for Trialer-3
latest roll up door parts trailer factory for Trialer-4
latest roll up door parts trailer factory for Trialer-5


Suggestions For Door Installation


latest roll up door parts trailer factory for Trialer-6            
1) Confirm the whole frame of width and height is consistent with the drawings, a diagonal dimension is uniform around the mouth of the cave.
2) In the condition that the size right to start the installation shutter connection plate.
3) When installing a connection plate to ensure about connection plate is in the same horizontal plane and vertical plane.
4) Around a fixed connection plate respectively.
5) The card button u-shaped seat in a connection plate.
6) Puts drum u-shaped seat.
7) Connect the ribbon with the curtain on a cylinder.
8) Connection, after put down gently sliding door, door lock cylinder torsion pin will fall off.


Remind


latest roll up door parts trailer factory for Trialer-7
Remind

The thickness of the door frame on the upper end of the hole height should not be greater than 10MM!
Due to different measurement methods, the measurement is allowed to be within 1mm-3mm error.
Due to the different colors displayed by different computers, the color of the actual product may be slightly different from the above image, affected by the physical object, thank you for your understanding.


Drawing


latest roll up door parts trailer factory for Trialer-8
latest roll up door parts trailer factory for Trialer-9
latest roll up door parts trailer factory for Trialer-10
latest roll up door parts trailer factory for Trialer-11



Product Details


latest roll up door parts trailer factory for Trialer-12
latest roll up door parts trailer factory for Trialer-13
latest roll up door parts trailer factory for Trialer-14

Product Message
Chat Online
Chat Online
Leave Your Message inputting...
Thank you for your enquiry. We will get back to you ASAP
Sign in with: